Quote

From:

11A Sellwood Street
Brighton-Le-Sands
2216 NSW

info@masterepoxysydney.com.au

Quote Number QUO-1008
Quote Date February 8, 2026
Total $21,586.40
To:
Star palace

15A railway pde , Fairfield NSW 2165

Hrs/Qty Service Rate/PriceAdjustSub Total
1 Approx 89.2m2 metallic epoxy

Surface preparation
- 1Grinding
removal by diamond grinding Diamond tools are run across the surface,fix all the Cracks , holes over the surface until is ready Supply and install in accordance with Australian standard

- 2 Apply Grout coat
- 3 Apply 1 coat of epoxy Base coat

- 4 Sending base coat checking if the floor dont have any imperfections.
- 5 apply design coat

- 6 Apply Top coat protection
Option Matt/satin/superclear
Supply and install in accordance with Australian standard

5 years warranty

ESTABLISHMENT FEES ARE INCLUDED IN OVERALL PRICE:
All work to be conducted in accordance with Australian standards

$19,624.000.00%$19,624.00
Sub Total $19,624.00
Tax $1,962.40
Total $21,586.40