Quote

From:

11A Sellwood Street
Brighton-Le-Sands
2216 NSW

info@masterepoxysydney.com.au

Quote Number QUO-1014
Quote Date February 19, 2026
Total $106,920.00
To:
Mode management

221 Sydney Park Rd, Erskineville

http://www.modemanagement.com.au
Hrs/Qty Service Rate/PriceAdjustSub Total
15 Epoxy marble finish

Surface preparation
- 1Grinding
removal by diamond grinding Diamond tools are run across the surface,fix all the Cracks , holes over the surface until is ready Supply and install in accordance with Australian standard

- 2 Apply Grout coat
- 3 Apply 1 coat of epoxy Base coat

- 4 Sending base coat checking if the floor dont have any imperfections.
- 5 apply design coat

- 6 Apply Top coat protection
Option Matt/satin/high gloss finish
Supply and install in accordance with Australian standard

5 years warranty

ESTABLISHMENT FEES ARE INCLUDED IN OVERALL PRICE:
All work to be conducted in accordance with Australian standards

$6,480.000.00%$97,200.00
Sub Total $97,200.00
Tax $9,720.00
Total $106,920.00

Add a comment

Your email address will not be published. Required fields are marked *